Municipal/Local Government
In the summer of 2022, Roth IAMS, via our Sourcewell Contract, collaborated with the State of Maine, Bureau of General Services to conduct a comprehensive Condition Assessment of the Augusta Parking Garage in Augusta, Maine. Erected in 1975, the Augusta Garage spans 140,000 GSF across two supported levels and a slab-on-grade level, accommodating 436 vehicles. Roth IAMS was tasked with evaluating the structural integrity of the garage due to historical concerns regarding its post-tensioned structure, compounded by repair work following a 2014 assessment.
Phase I involved a thorough review of existing reports and historical repair data, supplemented by on-site assessments and limited testing methods. This initial phase aimed to identify areas of concern and establish a foundation for targeted investigations. Phase II encompassed detailed, invasive testing of concrete and post-tension cables to assess the overall structural health accurately. Working closely with specialized consultants, Roth IAMS utilized various testing methodologies to pinpoint areas requiring further scrutiny.
One of the primary challenges encountered in Phase I was the absence of original structural drawings, necessitating innovative approaches to assess the garage’s condition accurately. Additionally, coordination with state personnel to ensure minimal disruption to parking operations during Phase II testing posed logistical challenges. Notably, investigating precast perimeter wall panels without access to original drawings proved critical, revealing heightened corrosion levels at panel connections.
The Parking Garage Condition Assessments project exemplifies Roth IAMS’ commitment to delivering comprehensive solutions tailored to our clients’ needs. By leveraging expertise and embracing challenges head-on, we not only provided invaluable insights but also empowered the State of Maine to make informed decisions safeguarding critical infrastructure assets. As a trusted partner, Roth IAMS remains dedicated to driving positive outcomes and enhancing the resilience of infrastructure systems nationwide.
Project Type
Parking Garage Condition Assessments
Project Dates
Phase I: December 2022, Phase II: July 2023